Michael McDaniel’s Dawning Awareness

the noise -is- the signal

Plumbing Rough-In

without comments


Plumbing Rough-In
Originally uploaded by mdm.

I guess copper pipe for water is passé. You can see red for hot, blue for cold, black for wastewater, and orange for the fire sprinkler system. Plumbers and fire sprinkler folks come first because the wastewater pipes have to maintain a certain slope, so they get priority for placement in the walls and floor.

Written by michael

May 26th, 2007 at 4:10 pm

Posted in Remodel

Leave a Reply